Bayview Services was contracted owner-direct with Sunset Development Company to provide LEED-EB -compliant soft demolition of the former AT&T headquarters. Bayview was recognized for our environmental sustainability and awarded this project based on our ability to comply with the LEED-EB requirements and aggressive construction schedule. Three full floors with a wingspan of three football fields per floor made a lengthy load out for our crew. Bayview developed a proprietary method of C&D removal to meet the schedule and keep our crew safe. Most of the carpet was recovered under the CARE program and 6000 SF was recovered and reused on another jobsite.
View ProjectBayview Environmental and Demolition Services were awarded the Soft Demolition and Abatement package for the German Consulate Structural Upgrades project in San Francisco. This project has unique hurdles as it is not only a German Consulate building but it was also deemed historic. Bayview Environmental has been tasked to remove asbestos and lead to facilitate the soft demolition scope that will be performed by Bayview Demolition.
View ProjectKiewit Corporation selected Bayview to perform multiple environmental and industrial services on the Oroville Dam, River Valve Outlet System Rehabilitation Project (RVOS) for the Department of Water Resources in Oroville, CA. Bayview Environmental was tasked with performing lead, asbestos, and PCB abatement on various surfaces throughout the facility. Bayview Industrial’s focus was on the draining, purging, and rinsing of hydraulic fluid from tanks, lines and valves that control the flow of water through the dam itself. All work was performed inside the dam while still fully operational which presented unique logistical and operational challenges to the team.
View ProjectThe project consisted of mold remediation, lead and asbestos abatement, hard & soft demolition at multiple buildings at the University. Mold remediation was performed by removing damaged drywall from the heavy rains. Abatement scope included abatement of lead plaster ceilings & walls for the MEP trades and removing quarry tile with an asbestos waterproofing membrane. We also used our labor to assist with anchoring scaffolding into asbestos stucco walls with the scaffolding subcontractor. Hard demolition consisted of saw cutting and chipping new openings and removing non-asbestos quarry tile with mortar bed systems with light demo diesel-powered equipment. We also used a combo of dustless blasting and bead blasting concrete surfaces for new waterproofing installation. Soft demolition consisted of removing stucco walls for new waterproofing and the removal of storefront systems for new doors. We had a large crew due to working at multiple buildings and tight windows to accomplish the work so other trades could follow behind us. This was our first job with Whiting-Turner in southern California.
View ProjectBayview Demolition Services was awarded the interior demolition and site demolition of the Uva Bar and Catal restaurant in Downtown Disney. Bayview was tasked to provide a full interior gut of this 2-story building which included dining areas, kitchens, walk-in freezers, back-office space, and restrooms. This included partition walls, flooring, ceilings, MEPs, elevator shaft, and structural deck openings for the new elevator and staircase. Demolition also included complete demolition of the Existing Uva bar at the exterior, including demo of structural steel, concrete deck, and subgrade. This project took place in the heart of an active Downtown Disney and required a day and night shift crew to meet the required schedule.
View Project