Bayview Environmental Services completed the asbestos cable abatement at the San Onofre Power Generating Station for its Decommissioning.
This project involved several challenges including extremely stringent access requirements, additional environmental hazardous training, protocols and PPE, difficult work area access due to elevated and congested infrastructure as well as stringent COVID-19 procedures.
The scope of work consisted of the removal and packaging for disposal of 27 miles of asbestos braided cables that are found throughout the plant and included the cleaning of asbestos surface dust from the 370,000 square foot facility. The contract was valued at over $7.7 million dollars and was completed on schedule.
View ProjectThe Pier 70 Building 12 project consists of asbestos and lead abatement, MEP and selective demo within a historical building. This project began with the decontamination of the entire building to allow access to other trades. The lead abatement scope consisted of removal of approximately 30,000 sq.ft. of paint on the columns, while the ACM removal process was of approximately 58,000 sq. ft. of roofing material. The MEP and structural demolition was approximately 30,000 sq.ft. This project included stringent requirements for local hiring and local business involvement. The current Bayview Environmental contract is valued at over $ 3,200,000.
View ProjectThe project at 1 North 1st Street consists of selective demolition, abatement, and soil excavation at a four story office building in Downtown San Jose. The demolition includes removal of concrete walls, concrete slabs, structural steel, and excavation for new elevator pits/footings, as well as sandblasting large wooden beams. The abatement scope includes removal of floor tile, mastic, and lead-paint from structural steel throughout. The project is phased with demo and abatement scheduled to be completed in early Summer 2020. The Bayview Demolition contract is currently valued at over $1,200,000.
View Project