Project Summary
Asbestos-related work included removal and disposal of flooring, mastics, fireproofing, TSI, drywall with joint compound, texture on concrete, roofing, penetration mastics, and transite panels. Lead-related work included removal and disposal of lead-lined drywall, loose and flaking paint, ceramic wall/floor tile, and terrazzo shower pans. PCB-related work included removal and disposal of roofing materials, penetration/pipe support mastics, aluminum windows and panel assemblies, stucco wall assemblies, perimeter metal roof flashings, air vents, window and door assemblies, and selective concrete.