Bayview Environmental services was contracted to complete the renovations of the 32,000 sf 2-story Building B at Alhambra High School. Additional renovations included the 8,000 sf Building H basement.

The scope of work at Building B included the abatement and demolition of interior finishes and roof. The abatement included removal and disposal of asbestos containing and lead materials; floor tile, mastic, tsi insulation, rolled roof, and drywall w/ joint compound. The selective demolition consisted of removal and disposal of interior partition walls, ceiling systems, MEP’s, flooring, & light fixtures.

The scope of work at Building H basement consisted of abatement of boiler insulation, floor tile/mastic, and tsi pipe insulation. The demolition consisted of piecing/torching apart 2 boilers, 1 cooling tower, and 1 chiller. This demolition included associated concrete pads and all associated wires, conduits, and plumbing lines. Bayview crews utilized a spider crane to safely rig materials from 15’ deep basement up to grade level.

Similar Projects
Employee Portal

Our Website uses cookies. Cookies are small text files held on your computer that help us understand how you use our Website. Our cookies do not store any personal information about you, and you can delete and block cookies via your browser settings at any time. By clicking “Ok” you agree to accept our use of cookies. Learn more by reviewing our privacy policy.