Project Summary
The project at 300 Lakeside was a project for the environmental division that involved the removal and replacement of insulation above-ceiling on fully occupied floors. Each night, Ceilings were opened up in select locations and containments were set up for dust control to allow for removal/replacement work. Due to the building being fully occupied, the floors were returned to the same condition as the night before on a daily basis. In total, approximately 500,000 square feet of insulation were removed and replaced on 20 floors.