Project Summary
The interior demolition across four floors of this occupied historical building included non-structural ceiling systems, partition walls, and floor finishes. The hazardous material abatement included asbestos and lead-containing materials, mercury-containing fluorescent light tubes, and PCB-containing lighting PCB ballasts. The project also required the salvage and storage of historical trim and window-paint preparation.