Bayview executed a multi-phased tenant improvement project at the IL06 building, performing interior demolition across four floors, including offices, conference rooms, lab spaces, and open work areas. The scope included careful removal and disposal of partitions, flooring, ceiling finishes, and MEP systems. The project was completed in seven distinct work areas, each requiring separate mobilizations, showcasing Bayview’s expertise in coordinating complex, phased demolition while maintaining efficiency and safety throughout the building.
View ProjectBayview successfully executed the removal and replacement of above-ceiling insulation on 20 fully occupied floors at 300 Lakeside. Each night, select ceiling areas were opened and containment systems were installed to control dust and maintain a safe environment for building occupants. At the end of every shift, floors were returned to their original condition to ensure uninterrupted operations. Over the course of the project, approximately 500,000 square feet of insulation were removed and replaced, showcasing Bayview’s ability to perform complex environmental work efficiently, safely, and with minimal disruption in high-occupancy buildings.
View Project