Project Summary
This project consisted of the removal of interior finishes and hazardous materials throughout a 12-story hospital facility. The abatement consisted of removal of drywall, floor tile and mastic, TSI, PCBs, and other types of hazardous materials. This project was performed in a closed-down hospital in preparation for the building to be completely demolished.