Project Summary
This project at a manufacturing facility consisted of the removal of interior finishes and manufacturing equipment, as well as of mechanical, electrical, and plumbing systems, plus concrete cutting, and concrete demolition throughout the entire building. In addition, we removed exterior manufacturing machinery and its support systems. The project required the salvaging and hoisting of machinery from different floors of the building and the exterior.