Project Summary
This project required months of planning as the historical Grace Cathedral was located directly adjacent to the worksite. Interior demolition and abatement took place while select exterior concrete was removed in precise locations to expose post tension rods. The largest portion of Bayview Demolition’s scope was two story pre-cast concrete panels which had to be removed in close proximity to the historical church. Prior to the removal of the panels, Bayview Environmental successfully removed the PCB contaminated caulking and concrete from the panels. After these panels were removed Bayview Environmental was then tasked to encapsulate all the remaining concrete using an epoxy encapsulant.