Project Summary
The project included abatement operations, closure of engineering systems (elevators, cooling, heating), air scrubbers, fume hoods, and subsurface tanks and service lines. The pre-demolition operations were followed by a hazardous soil excavation of 30,000 tons that were segregated by contaminant and designated waste facility.