Project Summary
This project consisted of soft and hard demolition, Bayview removed and disposed of selective full height and ceiling height drywall partitions, carpet flooring, ceiling tile and grid deck insulation, detailed main deck clips, disassembled and disposed of office cubicles.
Most of the soft demo was removed by utilizing hand tools to minimize any damage to items that are to remain. Also as part of our base contract Bayview will saw cut and dice concrete slab into 3’x3’ sections about 19,000 square feet and to be offloaded with bob cats. The roof demo scope included the removal of box car units with a weight capacity of 30K each and 60’ long. These units will be unbolted and rigged to be lifted with a large crane. The same procedure will apply to remove an existing 3000 SF steel platform, miscellaneous ductwork and penthouse finishes.