Project Summary
This large-scale project for Google included the removal of structural concrete slab, topping slabs and finishes in over 30 locations throughout a massive campus that was currently under construction. Challenges included working around multiple trades/contractors as the construction went on around our work areas. This project was performed during the Covid-19 pandemic and our crews had to take extraordinary measures for worker safety and infection control.